UNITED NATIONS DEVELOPMENT PROGRAMME

Project of the Government of India

PROJECT DOCUMENT

Table Of Contents


A. CONTEXT                                     
1. Description of Subsector - the UN & SDNs
2. Host Country Strategy                          
a) Government Commitment to SD
b) National Telecom Policy

3. Prior On-Going Assistance                     
a) SDNP-India & SDNP Global
b) National Informatics Centre

c) ENVIS & Info Terra

d) ERNET
e) IDRC


B. PROJECT JUSTIFICATION                            
1. Problem/Present Situation

a) Problems

b) Who identified the problem, link to UNDP

c) Present situation

2. Expected E-O-P Situation: Goals/Objectives   
3. Target Beneficiaries                         
a) Government

b) Academia

c) Business

d) NGOs

4. Project Strategy/Implementation Arrangements 
a) Goals/Objectives

b) Growth Plan

c) Implementation Arrangements

5. Reasons for Assistance from UNDP             

6. Special Considerations

7. Coordination Arrangements

a) Institutional systems

b) National Steering committee

c) National Programme Director

d) SDNP Office

e) Core partners

f) Association

8. Counterpart Support Activity 

C. DEVELOPMENT OBJECTIVE                          
D. IMMEDIATE OBJECTIVES/OUTPUTS/ACTIVITIES

1. Establish & Operate a Distributed Info.Clearinghouse

2. Organize an SDNP-India Association

3. Coordinate and Manage SDNP-India


E. INPUTS 

F. RISKS

G. PRIOR OBLIGATIONS AND PRE-REQUISITES           
1. Prior Obligations
2. Pre-Requisites


H. REVIEWS                                       
I. LEGAL CONTEXT

J. BUDGETS

1. UNDP Contribution ($)

2. GOI Contribution (Rs.)                       

3.  For Objective 1: Clearinghouse

a) UNDP Contribution ($)                                               

b) Government of India Contribution (Rs.)

4. For Objective 2: Association


a) UNDP Contribution ($) b) Government of India Contribution (Rs.) 5. For Objective 3: Management
a) UNDP Contribution ($) b) Government of India Contribution (Rs.)
ANNEXURES
1. Workplan
2. Review Schedule
3. Legal Text
4. Training Programme
5. Equipment Requirements
6. Job Descriptions
7. Participation Framework
8. Financial and Accounting arrangements
ATTACHMENTS
1 Request for advance of funds from UNDP
2 Status of Funds advanced by UNDP
3 Project Delivery Report for funds provided by UNDP
4 Annual report of UNDP - finance non-expendable equipment
5 Schedule of Advances LIST OF FIGURES
1. Options at a Glance
2. Profile of Information Users
3. Phases of SDNP-India's Evolution
4. Organizational Structure
5. Examples of Systems Necessary for SDNP
6. Details of MOEF Contribution
7. Objectives and Indicators of Growth
Number and TitleIND/95/019/A/01/99 - Establishment of Sustainable Development Networking Programme
DurationThree years
Project site New Delhi, and National
ACC/UNDP sector & subsector 0900 - Communication
0940 - Development Support Communication
Government sector & subsector Environment Information
Government Counterpart AgencyDepartment of Economic Affairs, Ministry of Finance.
Government implementing agency Ministry of Environment & Forests (ENVIS)
Executing agency Ministry of Environment and Forests
Co-operating or associated agency National Centre for Software Technology, (NCST), Bombay
Estimated starting dateJanuary 1997
Government inputs (in kind) Rs.16,412,000
UNDP and cost sharing/financing
UNDP/IPF US$ 205,638
IDRC US$ 205,636
SDNP US$ 205,636
Government US$ NIL
UNDP+CostSharing US$ 616,910

Brief description:

The SDNP-India intends to establish a distributed clearinghouse of information on Sustainable Development and an association of information users, carriers and providers by involving government, academia, business and NGOs.
On behalf of:
SignatureDateName/Title
The Government:
Executing agency:
UNDP:
United Nations official exchange rate at date of last signature of project document $1.00 = 35.50
4

A. CONTEXT

1. Description of subsector

Subsector: The Exchange of Information on Sustainable Development.

The UN and Sustainable Development Networks

The United Nations Conference on Environment and Development (UNCED), The Earth Summit, held in Rio de Janeiro in June 1992, resulted in a global plan of action, Agenda 21, which was endorsed there by over 179 countries. Agenda 21 emphasizes the importance of environmentally sound technologies, education, public awareness and training. The plan also emphasizes capacity building, which refers to co-operation with developing countries that encourages them to develop human and organizational resources to plan and implement sustainable development. The Earth Summit gave the United Nations Development Programme (UNDP) the leading role for capacity building within the UN development system. UNDP swiftly responded with Capacity 21, a broad plan of action to help developing countries formulate economic, social and environmental goals, plans, programmes and policies that lead to sustainable development. Capacity 21 also embraced the Sustainable Development Networking Programme (SDNP), a UNDP initiative launched in 1990 to make relevant information on sustainable development readily available to decision makers responsible for planning sustainable development strategies. Available and accessible information on sustainable development will be one of the primary ways of ensuring that development in the future progresses in a sustainable manner. Such development will be based on better decision-making with better information. Exchange of information on sustainable development will eliminate the need to begin each project from scratch:teams can learn from others' experiences. It will also promote sharing and joint ventures to achieve the common goal of sustainable development. Through an active pilot group of some thirty-five local and regional SDNPs, a number of developing countries have begun to obtain information that will help them prepare their own national Agenda 21s. SDNPs combine face-to-face meetings, electronic and other means of communication to link sources and users of information on sustainable development. Participants include government bodies, research institutes, non-governmental organizations, and grassroots and entrepreneurial organizations worldwide. The SDNP is more than an information network. SDNP foster informed dialogue and communications to encourage and empower stakeholders- the people upon whom development depends or who are most influenced by it - to become more active participants in the development process. Roundtable processes that bring together donor and developing country personnel, and public or community meetings involving participator decision making are examples of the types of consultations with which SDNPs become involved". Currently there is no network in India providing information on sustainable development which is equally accessible to all participants: government bodies, NGOs, Academia and Business. SDNP-India will uniquely fill this need. The type of information to be addressed by SDNP-India is given in Box 1.
Box1: Prospective SDN Subject Scope
ENVIS Subjects Additional Topics
Appropriate technology Toxic chemicals Climatology
Energy Himalayan ecology Population
Wildlife conservation Waste management Water resources
Human settlements Environmental Management Agriculture
Occupational health and safety Mining Poverty
Eastern & Western Ghat ecology Pollution Forestry
Desertification Animal ecology
Environmental education Environmental law
Mangroves & the marine environment Biodiversity Voluntary organizations and media
Based on subjects being currently handled by ENVIS and additional topics suggested by the SDNP-Task Force.
2. Host Country Strategy
Strategy formulation for the exchange of information on sustainable development is in its infancy. However, two lines of government policy are particularly relevant to the SDNP-India initiatives: the government's commitment to sustainable development and the environment; and its recent liberalization efforts, of which the Telecommunication Policy is a key part.
a) Government Commitment to Sustainable Development
The three major government contributions to environment and sustainable development over the past one and half decades may be summarised as:
  • establishment of basic infrastructure and agencies at Central and State levels;
  • formulation and enforcement of policy and legal instruments: egs. Conservation Strategy, amendment of outdated Acts or enactment of comprehensive new ones like the Forest Conservation Act and the Environment (Protection) Act; and
  • formulation and implementation of programmes and projects:egs ecodevelopment plans, Ganga Action Plan.
The National Conservation Strategy formulated in 1990 recommended six primary tasks aimed at sustainable development: Stabilisation of population growth, Integrated land use and water management, Conservation of biological diversity, Sustainable energy and resource utilisation, Pollution control, and Improvement of human habitats. This was followed by more specific plans such as the Environmental Action Program (EAP) and the National Forestry Action Plan (NFAP). The EAP aims to improve environmental services in India and to facilitate integration of environmental considerations into development programmes by improving environment assessment, environmental awareness and the role of NGOs. The NFAP will seek to increase and sustainably manage forests such that it contributes to bio-diversity, conservation, climatic needs and national development goals.
India has also contributed to international understanding on issues of environment and development since the Stockholm Conference in 1972. The Brundtland Report was officially released at New Delhi in 1987 and India was an active participant at Rio 1992, where the Prime Minister addressed the United Nations Conference on Environment and Development. One of the major operational obstacles has been the lack of coordination both within and outside government. The National Environmental Council recently set up under the chairmanship of the Prime Minister should contribute to bringing in more focused efforts towards the goal of sustainable development. The Ministry of Environment and Forests (MOEF) oversees the government efforts in environment and sustainable development with activities like survey and conservation of natural resources, environment impact assessment and pollution control, regeneration and development research, education and information, legislation and institutional support, and international cooperation. There are also several other ministries and agencies within the GOI addressing issues of sustainable development. One of the major parts of the MOEF is the Education, Training and Information Division, which has information distribution as one of its goals and realizes this through its Environmental Information System (ENVIS). At present ENVIS is a system of distributed databases. The concept links its Centres, known as ENVIS Centres, on priority subject areas on Environment and its associated fields. ENVIS also deals with the 'Centres of Excellence' related to environment. There are 20 ENVIS Centres concerned with a variety of subject areas related to environment. Nearly 6000 queries are received by the ENVIS network per year, which responds to these with substantive information as far as possible.
b) The National Telecommunications Policy
India's new Economic Policy aims to boost exports, improve global competitiveness, attract direct foreign investment and stimulate domestic investment. The success of this hinges considerably on improved telecommunications which is what the new Telecom Policy strives for. The main objective of the new Telecom Policy is"Telecommunications within the reach of all". More specifically, it aims to:
  • ensure basic services covering all villages as soon as possible at reasonable and affordable rates;
  • improve quality of telecommunications;
  • improve complaint redressals, dispute resolution and public interface;
  • encourage India to become a major exporter of telecommunications equipment; and
  • ensure security of information transmitted.
In July 1992, some Value-Added Service like e-mail, voice-mail, video conferencing, radio paging, audiotext services, video-text services, and cellular mobile phones were opened to the private sector. In addition, private companies are now also allowed to offer basic telephone services, provided they follow certain guidelines. The Telecom Policy encourages pilot projects in basic and value-added services. On the technological front, the Policy hopes to simplify procedures for the inflow of foreign technology, encourage indigenous technology, and set up a suitable funding mechanism for indigenous research and development. The major implications of the new economic and telecom policies is that privatization of services will reduce government's monopoly in telecommunications. This, in turn, will create more competition, possibly improve services and give consumers more choice. With the progress being made in telecommunications, the SDNP could evolve into a major contributor to the process of sustainable development in the country, given an equally supportive implementation environment. Other actors in society, including business, academia, and NGOs are also becoming more aware of issues of Sustainable Development. Both access to existing information as well as exchange of information between decision-makers are important and GOI is making progress on both fronts.
3. Prior On-Going Assistance
Several other programmes are also addressing the same subsector.
a) SDNP-India and SDNP Global:
With the catalytic support of UNDP, SDNP today is at some stage of initiation or operationalization in more than 35 countries. Although each country's SDNP is designed according to its own conditions and operates autonomously, the SDNP head-office in New York suggests the ventures and facilitates communications between the various efforts. One example is the Annual SDNP Coordinators Workshop. Prior assistance was provided by UNDP for the preparation of a Feasibility Study. The study showed the need for a SDNP in India today and suggested structural features. This was verified via a national consultation in February 1995. SDNP-India is now on the threshold of being established, as per the recommendations made in the study.
b) National Informatics Centre (NIC)
National Informatics Centre (NIC) was established to act as a focal point for the development of methodologies for; designing and implementing national information systems and data management techniques; maintaining inventories of primary data; establishing procedures and standards for data collection and dissemination; training users of and specialists in information systems; and data management and computing techniques. NICNET, which initially was assisted by UNDP, is now found in all Central Government departments, 32 states and more than 500 district administrations. DISNIC database, Informatics Development Programme, covers the sectors of agriculture, animal health and production, water resources, fisheries, cooperatives, forestry, natural resources, weather data and rural development etc. RENNIC, Research and Education Network programme of NIC Services, provides NICNET connectivity to all the Academic and Scientific Institutions recognized and funded by both Central and State Governments. NIC has in accordance with the recommendations of the Agenda-21 initiated the implementation of NICNET based Informatics for Sustainable Development Programmes. In the field of sustainable development, NIC took part in organizing in 1995 a national conference on Informatics for Sustainable Agricultural Development. Furthermore, NIC is involved in the implementation of the national Watershed Development Programme in Rainfed Areas.
c) ENVIS (MOEF) and INFOTERRA (UNEP)
INFOTERRA was established in 1976 by UNEP to promote the exchange of environmental information within and among countries. It is a decentralized international network incorporating diverse environmental information systems, i.e. a grid of designated national focal points. Each national focal point refers its users to the most appropriate information source. ENVIS acts as the National Focal Point (NFP) as well as Regional Service Centre (RSC) for South Asia Sub-region of INFOTERRA. The queries responded to by ENVIS network are the largest number among INFOTERRA Focal Points Worldwide. Presently ENVIS is being networked with all of its partners through ERNET (described below) so that it can access various national and international databases for catering to the information needs of its varied users groups.
d) ERNET
ERNET, the Indian Educational & Research Network, is a project of the Department of Electronics, Government of India, assisted by the UNDP. ERNET offers a variety of services such as electronic mail, electronic bulletin boards, directory services, access to public domain information and free software, and a distributed information system named Gopher and the World-Wide-Web, both of which use client-server technology. NCST operates the international gateway and the main switching centre of ERNET. NCST also plays a major role in offering technical assistance to educational and R & D institutions in the form of information, advice, and training for setting up e-mail connections. Fifteen nodes of ERNET are connected to each other using 9600 bps leased lines. These lines are being upgraded to 64 kbps links, one by one. Over three hundred academic and R&D groups exchange e-mail with each other using ERNET. Over 50,000 users are estimated to have access to ERNET facilities. Internet access is provided using a 64 kbps leaded line from NCST, Bombay, to the USA and 128 kpbs link from Bangalore to USA. Plans for ERNET include the expansion of a satellite communication system to enable ERNET to reach locations which do not have good data communication links.
e) IDRC supported information projects:
IDRC is also investigating the concept of a Pan Asia Networking programme: a computerized network to facilitate the exchange of information on development in Asia. IDRC also provided support for the SDNP-India's Feasibility Report.

B. PROJECT JUSTIFICATION

1. Problem/Present Situation

a) Problems:

The agencies and institutions involved in addressing issues of sustainable development in India are regularly confronted by two key problems:
i) Lack of effective exchange of information:
Most users in NGOs, academia, business and government are unable to access available information on sustainable development in the form and time they require it. Very often it is only a matter of automating the available information and adding value according to the users' needs.
ii) Lack of substantial interaction among users, providers and carriers of information on sustainable development:
There is no formal structure to bring together parties concerned with sustainable development in India to encourage such interaction. One extreme case of this is different parties working on the same problem separately. An unified and focused effort would produce greater and faster results.


b) Who identified problem & its link to UNDP:

The concept of a global Sustainable Development Networking Programme (SDNP) to facilitate effective exchange of information on environment and development evolved during the preparatory discussions for the Earth Summit at Rio in June 1992. With the catalytic support of the UNDP, SDNP today is at some stage of initiation or operationalisation in more than 35 countries. After a series of discussions with the UNDP, the Ministry of Environment and Forests, Government of India, with the support of UNDP and IDRC, initiated efforts to explore the possibilities of setting up an SDNP-India. In early 1994, they established a Task Force consisting of eminent experts and senior representatives from the Ministry of Environment and Forests, Department of Electronics, National Informatics Centre, National Centre for Software Technology, UNDP and IDRC. Additional members were to be co-opted as required depending on the interest of the institutions to be involved in SDNP-India. The first fundamental issue before the Task Force was to determine whether an SDNP-India was required at all. In case there was a positive indication, their primary responsibility would then be to outline the most appropriate design and implementation strategy for SDNP-India. A Pre-feasibility Study Team was asked to make a rapid assessment and report back to the Task Force. They met several government agencies, NGOs, academic institutions and companies in different parts of the country and established the need for a SDNP in India. The Pre-Feasibility Study, established the need for SDNP-India and also broadly outlined the scope of subjects to be covered, geographical spread and technological reach. The Task Force then appointed Development Alternatives to undertake a Feasibility Study to suggest various options that are possible for SDNP-India. The SDNP-India Feasibility Study (Jan.1995) outlines five options that have evolved from an assessment of the present situation in India and the guiding principles distilled from experiences of SDNP initiatives globally. Based on the primary functions they are expected to perform, the options may be labelled as a Clearing House, an Association of Networks, a high speed Backbone, a User Network and a Network Service Provider. In each case, the functions, operational requirements and financing opportunities are described. The predominant strengths, weakness, opportunities and threats are also presented. Figure 1 presents all the five optional frameworks at a glance. The Task Force met in October 1994 to discuss the five different optional frameworks evolved for SDNP-India. A combination of Option 2 (Association of Networks) and Option 4 (User Network) was selected to form the framework of SDNP India. The Task Force further suggested that elements of Option 1 (Clearinghouse Programme) be included, leaving the work of Option 3 (High Speed Backbone) and Option 5 (Network Service Provider) to be managed by existing electronic networks in the country.

c) Present Situation:

There are several networks currently operating, however:
  • some are computerized and some are not
  • few are specializing in aspects of sustainable development
  • few are inclusive of all the categories of participants
  • NGOs have relatively less access when compared to other groups.
  • there is inadequate exchange of information either between groups or even with each group.

2.Expected End-of-Project Situation

A technically and economically viable system will be established to facilitate effective exchange of information on sustainable development between all participants. The Networking Programme established will include:
  • a. a distributed CLEARINGHOUSE of information on sustainable development. This will enable access to both manual and automated users.
  • b. promotion of working links through an ASSOCIATION of information users, carriers and providers within government, academia, business and non-government organisation involved in issues of sustainable development. This will facilitate an exchange of information between all participants.
  • Figure 1: Options at a Glance
    Optional Framework
    Characteristics12345
    Title Clearinghouse Program Association of Networks High Speed Backbone User Network Network Service Provider
    Role of SDN Office Middleman ("Bridge") Facilitator Transporter Daughter Network Mother Network
    Primary Participants Info providers networks (electronic & manual -info providers
    -info users
    -networks (electronic)
    - network
    -Info users
    -Info providers
    -Info users
    Housing Possibilities anywhere anywhere government government NGO, independent
    Hardware Involved PCs,modems PCs,modems routers, modems,hi-speed lines router,modems, PCs, hi-speed links
    Specific indicators at the end of year 1 and 3 are given in Figure 7.

    3. Target Beneficiaries

    The most direct beneficiaries of SDNP-India will be the information users involved in the sustainable development process. They can be categorized into four functional groups:government, academia, industry and NGOs. See Figure 2 for examples of each.

    a) Government

    SD information users within government range from policy and planning bodies, line departments, and other agencies at Central, state, district and local levels. They require hard statistical data and also textual information for programme planning, monitoring, decision support, early warning, and disaster management responsibilities.

    b) Academic and research institutions

    Individuals and groups within educational and research institutions need both factual and textual information for their evaluation, design and policy advice functions, besides basic educational activities. Their requirements are currently fulfilled primarily from government and academic sources.

    c) Business and Industry

    Business and industry users typically require information on industrial and related policies, conditions on industrial sites in various locations, technologies, finance and markets. Presently this information is obtained from sources within industry like the associations and also government, very often through specifically commissioned consultancy studies and surveys. A bulk of the effort and resources goes into collection of routine data. There is no one place to get all the required information.

    d) Non-Governmental Organisation (NGOs)

    NGOs are involved in action research, awareness generation, development action, watchdog and policy advocacy; a major part of which can be easily classified within the ambit of sustainable development. About 100 work at the national level and have access to various resources, including automation. Some 20,000 work at grassroot level, with little access to resources, including information. If the above four groups benefit from the information exchange and knowledge from SDNP-India and are able to incorporate it into their operations to ensure more sustainable development, then the general population and the country as a whole also benefit. Figure2: Profile of Information Users
    (indicative examples based on functions)
    GOVERNMENT AGENCIES
    
    
    
    ACADEMIC & RESEARCH INSTITUTIONS
    
    
    
    * Planning and Policy Formulation
     -Planning Commission
     -State Planning Boards
    
    * Regulation and Monitoring
     -Central Pollution Control Board
     -Bureau of Indian Standards
    
    * Programme Implementation
     -Agriculture department
     -Forest department
    
    * Early Warning
     -Indian Meteorological department
    
    * Judicial/Arbitration
     -Consumer Protection Tribunals
     -Courts
    
    
    
    * Policy Advise
     -Centre for Policy Research
     -Indian National Science Academy
    
    * Evaluation and Design
     -Indian Institute of Technology
     -Indian Institute of Management
    
    * Methodology and Technique Development
     -Indian Statistical Institute
     -Central Leatwr Research Institute
    
    * Education and Training
     -Jawaharlal Nehru University
     -Gandhigram University
    
    
    
    BUSINESS & INDUSTRY
    
    
    
    NON-GOVERNMENTAL ORGANIZATION
    
    
    
    * Manufacturing
     -Bajaj Auto Ltd.
     -Tata Iron & Steel Co.
    
    * Financial Services
     -State Bank of India
     -Small Industries Development Bank of India
    
    * Development Services
     -Lipton India Ltd.
     -Tata Steel Rural Development Society
    
    * Consultancy Services
     -Envirotech Consultants
     -Engineers India Ltd.
    
    
    
    * Awareness and Education
     -Centre for Environmental Education
     -Centre for Science & Environment
    
    * Watchdog
     -Consumer Education and Research Centre
     -Traffic India
    
    * Policy Advise
     -Society for Promotion of Wasteland Dev
     -Indian National Trust for Art, Culture & Heritage
    
    * Action Research
     -Development Alternatives
     -Society for Rural Industralization
    
    * Development Action
     -Sulabh International
     -Social Work Research Centre
    
    
    
    Note: Most Institutions undertake more than one function.

    4. Project Strategy/Implementation Arrangements

    a) Goal and Objectives

    The goal of the Sustainable Development Networking Programme (SDNP) in India as brought out by the Feasibility Study sponsored by the Task Force, will be to facilitate effective exchange of information on sustainable development by:
  • i) establishing a distributed CLEARINGHOUSE of information on sustainable development for both manual and automated users.
  • ii) promoting working links through an ASSOCIATION of information users, carriers and providers within government, academia, business and non-government organisation involved in issues of sustainable development.
  • b) Growth Plan

    The Creation Phase in the first year will focus on laying the foundations for establishing a distributed clearinghouse and an association of interested participants. Considerable effort will go into mobilising core members of the association and channelising their current efforts such that at least the manual and some automated clearinghouse activities can start immediately after inception. The Growth Phase over the next two years will build upon the base established in the first phase in terms of expanding participant, technical, geographic and subject coverage. The focus at this stage will be to attain credibility and confidence among the participants and society at large. During a third stage the Sustenance Phase, over the following two years, the programme will channel its efforts to ensure that it can sustain itself on a cost recovery basis. Outputs may appear to plateau temporarily but this will be essential to differentiate between the genuinely interested and committed participants and the free-ride passengers. A graph depicting the phases of the SDNP-India evolution is given in Figure 3.
    In order to implement this plan, this project will adopt the following steps:
  • i) Support ENVIS/ERNET to build additional capacity to enhance subject scope, types of users and efficiency.
  • ii) Support the nodes to be linked by enhancing their capacity to become partners in the network.
  • iii) Strengthen SDNP-India's coordination mechanism and its link with NCST.
  • SDNP-India will be initiated by the Government of India with donor funding from UNDP, IDRC, SDNP-NY, as well as important contributions in cash or kind from other key players. However, it will rely on the entrepreneurship of the participants to make it self reliant. Financing can be mobilised from the donor community and also through collaboration among participants. A group of users may be organized to pay in advance for customised information that can be generated by providers who are SDNP Association members. If a business user needs information on recycling, he could finance a SDNP database on the subject. A NGO could sponsor a BBS pertaining to its area of work. SDNP-India will have to provide information services virtually free for the first couple of years to convince users it is important and worthwhile. Cost-recovery schemes can be implemented thereafter. The exact cost structure can be detailed after seeing the demand for services during the first years.

    c) Implementation Arrangements:

    The Ministry of Environment and Forests (MOEF), Government of India, will be the Executing Agency for the SDNP-India Project. ENVIS will be the Implementing Agency while NCST will provide technical support and linkage with ERNET. National Project Director (NPD) will be guided by the advise of the SDNP National Steering Committee to oversee the execution and effective implementation of the project. The NPD, in consultation with Steering Committee, will appoint a National Project Coordinator (NPC) to oversee day-to-day operations. The NPC will work under the direct supervision and control of the NPD. One of the computer professionals of SDNP-India will be located at NCST. The NPC and team will work towards building the Nodes and executing the Clearinghouse and Association activities envisaged in SDNP-India.

    5. Reasons for Assistance from UNDP

    The need for SDNP-India was very clearly established in the Feasibility Study. Assistance has now been requisitioned from UNDP to catalyze the setting up of SDNP-India. UNDP is uniquely positioned to assist SDNP-India because:
    • of its global experience in general institutional building and specially SDNPs in 35 other countries.
    • it is seen as a neutral agency with the credibility to promote such an initiative
    • it was a prime-mover in setting up the SDNP-India Task Force, sponsoring the Feasibility Study and catalysing the entire venture.

    6. Special Considerations

    Special considerations for a national SDNP have evolved from several documents released by UNDP/IDRC. These consists of many broad guiding principles but there are some key ones that this project should keep in mind in terms of the process of setting up and operating a national SDNP and its outputs (products and services). Experience till date indicates that for a national SDNP to have better chance of establishing itself, the process needs to encourage participation of all potential actors from the beginning of thereby evolve from local circumstances. Similarly, products and services will benefit the potential users more if they meet local needs and are more easily accessible.

    7. Coordination Arrangements

    a) Institutional Systems

    The structure envisioned for SDNP-India consists of the National Steering Committee, National Programme Director (NPD), SDNP Office, Core Partners and the Association. NCST and ENVIS would also be involved. Please refer to Figure 4 for an organization chart.

    Figure 4. Organizational Chart

    While SDNP-India will evolve from a small number of participants, it is important that players from all concerned constituencies are involved from the beginning. The initial participants must assimilate and own the concept to successfully expand the process.

    b) National Steering Committee

    The role of the National Steering Committee will be to guide the operations of the SDNP-India, including the tasks of selecting the NPD, setting up policies, advising on the appointment of the NPC, reviewing work plans, and monitoring operations from time to time. The NSC will also decide the criteria and performance specifications for selection of nodes. It will have about a dozen members who are credible and represent the needs of committee participants. These will include general users, carriers and providers, SDNP Nodes, Primary SDNP Carriers, SDNP Office, and financing agencies. The composition should also cover government, academia, business and NGO interests. They will meet twice a year or more often if required.

    c) National Programme Director (NPD)

    The NPD will be a Senior Officer from the MOEF, responsible for ENVIS. The NPD will oversee the execution and effective implementation of SDNP-India in close collaboration with ENVIS. The NPD will work for the SDNP under the advise and direction of the National Steering Committee.

    d) SDNP Office

    The SDNP Office will coordinate/manage the activities of the programme and be responsible for the Clearinghouse and Association functions. It will also liaise with ENVIS and NCST as well as act as the main SDNP-Node. The SDNP office will be managed by the National Project Coordinator (NPC). The SDNP office will be located in ENVIS as it is currently performing most of these functions and has working links with a majority of the constitutiences involved in sustainable development issues. It has a nationwide network and a query-response service covering a fair number of subjects related to sustainable development. It is also the regional hub of the global INFOTERRA programme of UNEP. While ENVIS involves government, academia and NGOs, its links with the business community will have to be considerably strengthened. The SDNP Office will consist of a Team of professional and support staff headed by a National Project Coordinator (NPC). To initiate the programme, the NPC will have to be selected at the earliest by the host institution in consultation with the National Steering Committee. Experience has shown that the NPC needs to have the following skills and capabilities:managerial skills, leadership, communication skills, understanding of technology, entrepreneurial, good business sense, change agent, problem-solver, marketing abilities, good reputation and acceptable to all participant groups.
    SDNP Team to be chosen by the NPC will consist of a maximum four professionals, two computer professionals, one information scientist and one professional for promotion and training activities and four support staff. A number of operational systems (guidelines and procedures) need to be developed by the NPC, with the assistance of the Association and the Team, in the early stages. Figure 5 gives some important examples.

    Figure 5: Examples of Systems Necessary for SDNP

    • System for updating SD Sources directory.
    • System for maintaining inventory of information providers and information.
    • System for transformation of data into useful information and forms that will be helpful in decision making.
    • System to encourage and enable players to share information.
    • System to make information accessible and transparent.
    • System for timely dissemination of information to automated and non-automated users.
    • System for improved coordination among different types of information providers.
    • System for training SDNP Coordinator and staff.
    • System for training users how to utilize the information.
    • System for training providers how to collect, store, assess, transform data into useable information, computerise and mount the information on SDNP.
    • SDNP can use universities, specialised institutes (e.g.NIIT), SDN Coords Workshop, special course, etc. to provide training.
    • System for awareness building among all participant groups on the importance/usefulness of information in general and SDNP in particular. Possible use of radio/TV shows to answer queries.
    • System for collecting feedback from users (automated and non-automated): data received, data correct, response time, action taken as a result of information, impact of action.
    • System for monitoring progress and determining success. Performance indicators will be needed to compare actuals against planned targets: qualitative and quantitative;short-term and long-term. Examples of some measures of success are the number of SDN node sites, the number of IPs, the number of automated databases, and the number of regular users. Can also ask other networks in India how they are measuring their performance.
    • System to report to National Steering Committee (Association), donors, and SDNP-NY.
    • System of checks:internal and external audits.

    e) Core Partners

    Core partners of the SDNP-India will include ERNET/NCST and the SDNP-India Nodes who will coordinate with the SDNP Office. ERNET/NCST will provide electronic network services to the Project. The head of NCST will also be a Project Advisor (PA) to SDNP-India. The SDNP Nodes will be the most critical link between the participants of the Programme. Any user will see these nodes as the window for the SDNP products and services. While these Nodes will be independent entities, they will receive nominal technical, financial and other support from the SDNP Office. Initially there will be about 10 Nodes distributed across the country. Eight of these initial nodes will be ENVIS centres, run by the ENVIS Department of MOEF. These Nodes may be selected from among credible and interested institutions representing regions, subjects and participant group. They should currently be information providers or carriers in a position to mount some databases on sustainable development subjects almost immediately. They need to have demonstrated the ability to perform the other clearinghouse functions both electronically and manually with wide user base. An indicative list of potential Nodes is provided in Appendix 1 of the SDNP-India Feasibility Study. Over a period of three years, SDNP-India can have about 30 Nodes.

    f) Association

    The Association will be composed of a General Body, Working Groups and a Management Group. The SDNP Office will be the secretariat to the Association. Any individual or institution concerned with exchange of information on sustainable development will be eligible to become a General Body Member. The primary purpose of becoming a member will be to resolve common problems, and develop and work on projects jointly. It will be very useful for the Association to evolve some form of a Code of Conduct. The Association can be initiated by a critical mass of about 50 concerned information users, carriers and providers from government, academia, business and non-governmental organizations and grow to about 200 members. Working Groups will be constituted as and when the requirement arises to address the specific needs of a particular group of members or an issue of common concern. The General Body will elect a Management Group which represents the various constituencies of the membership to oversee the activities of the association. The General Body will meet twice in the first year and after that on an annual basis. The working groups can meet as required, while the Management Group will meet once every quarter. In addition, bulletin board systems will be used as a means of discussion. SDNP New York acts as a focal point for SDNP globally, by facilitating the exchange of SDNP-related information between countries and providing advice on administrative policy and operational procedures.

    8. Counterpart Support Activity

    The Ministry of Environment and Forests (MOEF) is in a position to place various resources at the disposal of SDNP-India by leveraging the activities of their Education and Information Division (including education, ENVIS Centres, NNRMS, grants, Centres of Excellence), seminars and Paryavaran for which the total annual budget is currently approximately Rs.10 crores). MOEF will contribute substantively and also financially towards initiating and operationalizing SDNP-India by:
  • a) hosting SDNP-India and providing space for the SDNP-India Office subject to approval by GOI.
  • b) having ENVIS' director also act as SDNP-India National Programme Director (NPD).
  • c) providing as matching funds for approximately 48% of the Year 1 budget of SDNP-India from the available budgetary provisions of the Education and Information Division of the MOEF. The finances committed by MOEF will primarily be those which are already being spent/committed for the Focal Point at the Ministry and other ENVIS Centres participating in SDNP-India from the existing budget heads.
  • d) designating 8 of the 20 ENVIS Centres as SDNP-India nodes in Year 1. Since ENVIS would be providing 8 out the 10 SDNP-India nodes proposed in Year 1, a quick start of SDNP-India would be possible.
  • The specifics of the proposed contribution of the MOEF to SDNP-India during the first year versus the total required funding its outlined in Figure 6.
    For operational efficiency, NCST Bombay will provide technical support and linkage of SDNP-India with ERNET.
    NCST will also contribute in terms of:
  • a) the services of the Project Advisor
  • b) technical staff support
  • c) access to ERNET infrastructure
  • d) office space that the equipment and staff are located in.
  • Figure 6: DETAILS OF MOEF CONTRIBUTION DURING YEAR 1

    SUMMARY BUDGET: (Rupees)
    Budget headsSDNP year 1MOEF contributionBalance
    SDNP Office
    Frontened costs25300005300002000000
    Recurring costs 224700002247000
    Catalytic Funds
    for nodes15000001200000300000
    for databases30000002400000600000
    training/promotion310000015000001600000
    Total 1 237700056300006747000
    DETAILED BUDGET:
    Budget headsSDNP year 1MOEF contributionBalance
    SDNP Office
    FRONTEND COSTS:
    Hardware
    1. 486 Server (2)500000500000 0
    Modems (2)1200000120000
    Router9000000900000
    Software
    Unix w/TCP/IP2000000200000
    RDBMS6000000600000
    leased line (9600 bps)1500000150000
    2. telephone lines (2)600003000030000
    Total frontend costs: 25300005300002000000
    The budgetary estimates regarding MOEF's contribution are purely provisional and tentative at this stage and are subject to final approval by the GOI.
    DETAILED BUDGET: (RS.)
    RECURRING COSTS:
    Budget headsSDNP year 1MOEF contributionBalance
    line rental for 9600 bps line150000 0150000
    HW & SW Maintenance2530000253000
    Miscellaneous costs500000 0 500000
    3.Staff costs (9) 744000 0 744000
    Rent for premisesNIL NIL NIL
    Travel & local200000 0 200000
    Office expenses 200000 0 200000
    Telephone costs200000 0 200000
    Total recurring costs:224700002247000
    *** Catalytic Funds***
    FOR SDNP NODES:
    Budget headsSDNP year 1MOEF contributionBalance
    4. Node Costs (10) 1000000 800000 200000
    5. Subscription costs 500000 400000 100000
    FOR DATABASE DEV.
    6. Automating (5) 1000000 800000 200000
    7. Developing (5) 2000000 1600000400000
    FOR TRAINING/PROMOTION
    8. Meetings 1000000 1000000 0
    9. Fellowships (10) 1100000 0 110000
    Promotions 500000 0 500000
    10. Training (5) 500000 500000 0
    Total Catalytic funds: 7600000 5100000 2500000
    EXPLANATORY NOTES;
    The column titled 'SDNP Year 1' gives SDNP-India's Year 1 budget, taken from section 4.4 of the Feasibility Report. The column titled 'MOEF Contribution' shows MOEF proposed contribution for Year 1. The column titled 'Balance' gives the outstanding balance, i.e. the amount yet to be financed in Year 1.
    Proposed contributions from the Information Division of the MOEF:
    (This represents the funds which are already being committed/spent on the ENVIS focal point and the ENVIS Centres)
  • 1. 2486 Server in the ENVIS Focal Point Office which would be housing the SDNP office = Rs.500,000.
  • 2. 1 phone line in the SDNP Office = Rs.30,000.
  • 3. ENVIS cannot assist with staff for the SDNP Office.
  • 4. 8 ENVIS-SDNP nodes during the first year, at a cost of Rs.100,000 per node.
  • 8 X 100,000 = Rs.800,000.
  • 5. ERNET subscription costs for its 8 SDNP nodes, valued at the SDNP budgeted amount of
  • Rs.50,000 per node.
  • 8 x 50,000 = Rs.400,000.
  • 6. Automate 4 databases, spending Rs.200,000 each.
  • 4 x 200,000 = Rs.800,000.
  • 7. Develop 4 databases, spending Rs.400,000 each.
  • 4 x 400,000 = Rs.1,600,000.
  • 8. Rs.1,000,000 towards organizing ENVIS-SDNP conferences.
  • 9. 5 training programs, at Rs.100,000 each.
  • 5 x 100,000 = Rs.500,000.

  • C. DEVELOPMENT OBJECTIVE

    The primary development objective of the SDNP-India will be to promote the process of sustainable development through organised accessibility to and exchange of information among all concerned parties. The secondary objective of SDNP-India will be to link up with the global SDNP.

    D. IMMEDIATE OBJECTIVE/OUTPUTS/ACTIVITIES

    The primary aim is to assist in building national capacity to operationalise SDNP-India. More specifically, the capacity building assistance will include the following objectives, outputs and activities. Each objective has associated with it certain outputs: key indicators or outputs by which the evolution process can be monitored and controlled. This will enable evaluations at critical milestones for considered change in strategic or operational directions. The outputs are achieved by performing several specific activities. The basic intent is to begin with activities that will quickly result in useful and visible products and services (e.g. a referral point office, SD Sources directory and database) and then proceed to more complex tasks and service. Prototype information products and services will have to be developed during the early stages to enable users to understand what SDNP can offer.

    Objective 1: Establish and Operate a Distributed Clearinghouse

    The primary aim of the distributed Clearinghouse will be to answer and channel queries related to sustainable development. The Clearinghouse programme will address the specific needs of both the manual and automated users. Initially there will be more manual users communicating via post, on the telephone and in person. When the electronic network is well established, automated access will become more predominant.

    Outputs:

  • i) query-response service of - 70,000/annum operationalised
  • ii) - 40 conference on sustainable development related issues
  • iii) - 30 databases on sustainable development related issues mounted
  • iv) - 30 nodes established with 200,000 transactions/annum
  • Activities:

  • i) Set up infrastructure for Clearinghouse:
    • personnel at Centre:
      • at ENVIS: 1 computer professional, 1 Information professional, 2 Support staff
      • at NCST: 1 computer professional
    • equipment at Centre
    • equipment at nodes
    • train nodes
    • systems at Centre
    • procedures for nodes
  • ii) Operate query/response service
  • iii) Moderate BBSs/Conferences
  • iv) Mount databases (automate existing or developing new databases)
  • v) Provide e-mail and gateway services
  • Objective 2: Organise an SDNP ASSOCIATION

    This Association will be open to individual and institutions concerned with exchange of information on sustainable development. They may be information users, carriers or providers from among government, academia, business, and non-governmental organisations. The primary purpose of the Association will be to provide its members a forum to evolve and take up activities jointly such that efforts for exchange of information on sustainable development are complementary and mutually reinforcing. Project evolved jointly will stand a better chance of financial, technical and other support from members and other agencies. The Association will also be in a position to arrange for training, fellowships and other interactions among members. In the process, the Association will enable its members to discuss problems and concerns, actively involve themselves in information exchanges activities and promote the concept of SDNP in India, besides becoming part of a global community.

    Outputs:

  • i) Association of 200 members established
  • ii) 15 training programmes organised
  • iii) Over 30 promotional ventures conducted
  • iv) Over Rs.9 million in funds raised and 30 projects sponsored
  • Activities:

  • i) Set up infrastructure for Association:
    • Personnel at Centre: 1 professional, 1 support staff
  • ii) Establish a forum for SDNP-India participants
  • iii) Educate/train SDNP-India participants.
  • iv) Promote SDNP-India
  • v) Support fundraising for SDNP-India members
  • Objective 3. Coordinate and manage SDNP-India

    The concept and functions of SDNP-India can evolve over a course of five years, leading to the establishment of a reasonable complex entity capable of major information-related initiatives. It will begin mainly as a manual Clearinghouse, introducing automated facilities gradually, and yet maintaining the active involvement of manual participants through a vibrant Association composed of about 250 members. The primary task of operationalising this endeavour will fall on the SDNP-India Office. This will include planning, executing and monitoring the specific task of the Clearinghouse and Association and also managing the finances of the Programme. Their activities will be monitored and approved by the National Steering Committee at appropriate milestones.

    Outputs:

  • i) Operation according to business plan and funds available
  • Activities:

  • i) Set up infrastructure for Management/Coordination:
    • personnel at Centre: 1 coordinator, 1 support staff
    • management systems
    • equipment at Centre
  • ii) Plan detailed functions of SDNP-India
  • iii) Monitor activities of SDNP-India
  • iv) Manage SDNP-India finances

  • Figure 7 gives the three objectives discussed above, the main activities associated with each and goes further to offer some key indicators/outputs that have been developed to define the end of the Creation, Growth and Sustenance phases (refer to Figure 3) of each objective. Tangible indicators have been determined wherever possible. In most cases they reflect a measure of product or service, while in other cases they refer to an internal requirement, such as management reporting. Since the programme itself is visualised as an enabling mechanism, the results to be achieved by the SDNP Office and efforts of participating members have been indicated separately.

    E. INPUTS

    The budget of SDNP-India has been given in Section J. Inputs/Support to be provided by Government of India, in particular by the Ministry of Environment and Forests (MOEF), have been explained in Section B.8 of this report. In summary, it includes some frontend costs of the SDNP-Office and significant portions of the catalytic funds needed for nodes, databases, and training. SDNP-India budget is to be subjected on a cost-sharing basis from IDRC, SDNP-NY and UNDP, given over a period of three years. It includes project personnel, sub-contracts, training, locally procured equipment, operation and maintenance and reporting costs. Any further funds required by SDNP-India will have to be self-generated on an entrepreneurial basis.

    F. RISKS

    Delay in the provision of concessional telecommunications tariff will cause delays in project implementation. The MOEF, UNDP and other stakeholders will continue to impress upon DOT to provide concessional tariffs. A lack of full/active participation of Nodes will result in fewer members, fewer services/products. To prevent this from happening, SDNP-India Management needs to do the following:incentive schemes, regular audits, clear, frequent and regular communication of goal/objectives and progress; good interaction between nodes and carriers; good marketing plan and implementation. If non-commercial users are not convinced of having to pay for information, SDNP-India will not be economically self-sustainable. Therefore, SDNP-India Management needs to have and implement a good marketing plan. These are fairly general risks to be expected of such a project but all equally important. The common theme is 'lack of participation'. However, being fully aware of the risks and their effects, the SDNP-Coordinator should ensure that all necessary systems (such as those mentioned above and those listed in Figure 5) are put in place to avoid them. SDNP-India UN Project Document December 1995
    Figure 7: Objectives and Indicators of Growth
    Objectives
    
    
    
    Indicators(products & services)
    
    
    
    Creation (end of 
    
    
    
    Phase
    year 1)
    
    
    
    Growth (end of 
    
    
    
    Phase
    year 3)
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    1. CLEARING HOUSE
    a) Operate Query-Response Service
    
    
    
    - No. of queries responded/annum
    
    
    
    2,750
    
    
    
    13,750
    
    
    
    6,250
    
    
    
    70,300
    
    
    
    b) Moderate BBSs/Conference
    
    
    
    - No. of conferences on SDNP operationalised
    - No. of conferences on SD general operalised
    - No. of conferences on SD components operationalised
    - No. of conferences on networking (technical) operationalised
    
    
    
      1
      1
    
      -
    
      1
    
    
    
       1
       3
    
      10
    
       1
    
    
    
      1
      2
    
      -
    
      1
    
    
    
       1
      10
    
      30
    
       2
    
    
    
    c) Mount database (automate              existing or develop new                 databases)
    
    
    
    - No. of directories on SD sources mounted
    - No. of databases on SD general mounted
    - No. of databases on SD components mounted
    - No. of databases on networking technologies mounted
    
    
    
      1
      1
      -
      -
    
    
    
       2
       1
      10
       1
    
    
    
      1
      1
      -
      -
    
    
    
       5
       1 
      30
       2
    
    
    
    d) Provide E-mail and Gateway          services
    
    
    
    - No. of SDNP nodes established
    - No. of automated users registered
    - No. of manual users registered
    - No. of transactions/year
    - No. of transactions/year with national networks
    - No. of transactions/year with international networks
    
    
    
      1
     100
     200
    7000
    5600
    1400
    
    
    
      10
      500
     1000
    35000
    28000
     7000
    
    
    
      1
     200
     200
    19000
    15200
     3800
    
    
    
      30
     2,250
     2,250
    213,750
    171000
     42750
    
    
    
    SDNP-India      UN Project Document     December 1995
    Figure 7: Objectives and Indicators of Growth (continued)
    
    
    Objectives
    
    
    
    Indicators(products & services)
    
    
    
    Creation (end of 
    
    
    
    Phase
    year 1)
    
    
    
    Growth (end of 
    
    
    
    Phase
    year 3)
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    2. ASSOCIATION
    a) Establish a forum for SDNP participants
    
    
    
    - No. of members' joint ventures developed
    - No. of international collaborations forged
    - No. of (diagreements) differences ironed out
    - No. of instances of lobbying and fulfilling members' needs
    - Code of Conduct developed and accepted
    - Packages of SD info services designed
    - Models for effective use of SD info developed
    - No. of members
    
    
    
      -
      2
      *
      *
      _/
      -
      -
     25
    
    
    
       1
       2
       *
       *
       _/
       -
       -
      25
    
    
    
      -
      4
      *
      *
    
      1
      1
     50
    
    
    
       5
       5
       *
       *
    
       2
       2
     200
    
    
    
    b) Educate/Train SDNP participants
    
    
    
    - No. of training programmes organised
    - No. of national fellowships/interactions arranged
    - No. of international fellowships/interactions arranged
    
    
    
      -
     10
      3
    
    
    
       5
       -
       -
    
    
    
      -
      30
       9
    
    
    
      15
       -
       -
    
    
    
    c) Promote SDNP
    
    
    
    - No. of question/answer programmes organised on AIR/Doordarshan
    - No. of regular column articles in a periodical
    - No. of queries on SDNP on toll-free telephone
    - No. of issues/annum of SDNP periodical
    - No. of presentation/phase on SDNP at seminars
    
    
    
      2
      4
    500
      4
    
      6
    
    
    
       2
       4
       -
       -
    
       -
    
    
    
      6
     16
    2500
      6
    
      6
    
    
    
       6
      16 
       -
       -
    
       -
    
    
    
    d) Support fundraising of SDNP         members
    
    
    
    - Quantum of funds generated for members projects
    - No. of members projects funded due to association support
    
    
    
     Rs.3m
       10
    
    
    
      Rs.9m
      30
    
    
    
    SDNP-India      UN Project Document     December 1995
    Figure 7: Objectives and Indicators of Growth (continued)
    
    
    Objectives
    
    
    
    Indicators(products & services)
    
    
    
    Creation (end of 
    
    
    
    Phase
    year 1)
    
    
    
    Growth (end of 
    
    
    
    Phase
    year 3)
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    by SDNP office
    
    
    
    by members
    
    
    
    3. COORDINATION/MANAGEMENT
    a) Plan detailed functions of SDNP
    
    
    
    - Detailed Business Plan developed
      (including cost-recovery structure)
    - Post 5-year Plan developed
    
    
    
      _/  
    
      -
    
    
    
      -
    
      -
    
    
    
      -
    
      -
    
    
    
      -
    
      -
    
    
    
    b) Monitor activities of SDNP
    
    
    
    - Detailed tracking mechanism developed
    - Half yearly progress reports submitted
    
    
    
      _/
      _/
    
    
    
      -
      -
    
    
    
      -
      -
    
    
    
      -
      -
    
    
    
    c) Manage SDNP finances
    
    
    
    - Available SDNP funds managed within 10% of budget
    - Additional resources mobilised through projects
    - Funds disbursement system evolved and streamlined
    
    
    
      _/
      -
      _/
    
    
    
      -
      -
      -
    
    
    
      _/
      _/
      -
    
    
    
      -
      -
      -
    
    
    
    • Numbers are not meaningful at this stage.

    G. PRIOR OBLIGATIONS & PRE-REQUISITES

  • 1.Prior Obligations: i.e. Pre-conditions for UNDP Assistance.
    • Legal agreements or MOU are needed from MOEF and NCST regarding their participation/assistance/roles in SDNP-India.
    • The Department of Telecommunications (DOT) should be involved in the discussions regarding the set up and operation of SDNP-India and positively enable the SDNP-India process via various methods, including a concessional tariff for non-commercial users.
    • The project document will be signed by UNDP and UNDP assistance to the project will be provided only if the prior obligations stipulated above have been met to UNDP's satisfaction.
  • 2.Pre-requisites: i.e. Actions necessary for smooth project implementation.
    • Formal selection of the appropriate SDNP-India host and therefore SDNP-India Office site and National Project Director.
    • Creation of the National Steering Committee.
    • Proper evaluation/selection of the National Project Coordinator.
  • Other systems necessary for the smooth running of SDNP-India are listed in Figure 5.
    
    
  • 1. The Government of India will provide the necessary infrastructure in terms of office space/staff and other facilities as must be necessary for the smooth operation of the project.
  • 2. The Government will delegate the requisite powers to the National Project Director to ensure smooth implementation of the project. Necessary power and authority will be delegated to the National Project Director to enable him to open and operate a separate bank account to receive funds from UNDP and incur expenditure in Indian rupees in connection with the implementation of the project. The NPD would submit the final report periodically as per the requires of UNDP. The foreign expenditure component of this project is very limited and UNDP would be willing to release foreign exchange for the project activities on receipt of request from the NPD on the prescribed format. The project staff stationed at Headquarters would be provided training guidelines for execution of the project nationally.
  • It should be recognized that success of such a complex nationally executed project would lie substantially on such delegation of authority and responsibility to the National Project Director.
  • The project document will be signed by UNDP, and UNDP assistance to the project will be provided, subject to UNDP receiving satisfaction that the pre-requisites listed above have been fulfilled or are likely to be fulfilled. When anticipated fulfillment of one or more pre-requisites fails to materialize, UNDP may, at its discretion, either suspend or terminate its assistance.

    H. REVIEWS

    The project will be subject to tripartite review (joint review by representatives of the Government (DEA), executing agency (MOEF/ENVIS) and UNDP at least once every 12 months, the first such meeting to be held within 6 months of the start of full implementation. The national project coordinator shall prepare and submit to each tripartite review meeting a Project Performance Evaluation Report (PPER). Additional PPERs may be requested, if necessary, during the project. A project terminal report will be prepared by the NPC/NPD for consideration at the terminal tripartite review meeting. It shall be prepared in draft sufficiently in advance to allow review and technical clearance by the executing agency at least four months prior to the terminal tripartite review. Apart from the annual reviews described above, the content, organization, terms of reference and timings of other reviews/reports will be decided in consultation between the parties involved in the project-including the SDNP-India Coordinator, the SDNP-India Steering Committee, MOEF, NCST, SDNP-NY and UNDP.

    I. LEGAL CONTEXT

    This project document shall be the instrument envisaged in the Supplement Provisions to the Project Document, attached hereto. The host country implementing agency shall, for the purpose of the Supplement Provisions to the Project Document, refer to the government co-operating agency described in the Supplemental Provisions. The following types of revisions may be made to this project document with the signature of the UNDP Resident Representative only, provide he or she is assured that the other signatories of the project document have no objections to the propose changes:
  • a) Revisions in, or addition of, any of the annexes of the project document (with the exception of the Standard Legal Text for non-SBAA countries which may not be altered and the agreement to which is a pre-condition for UNDP assistance);
  • b) Revisions which do not involve significant changes in the immediate objectives, outputs or activities of a project, but are caused by the rearrangement of inputs already agreed to or by cost increases due to inflation; and
  • c) Mandatory annual revisions which rephase the delivery of agreed project inputs or reflect increased expert or other costs due to inflation, or take into account agency expenditure flexibility.
  • The Government executing agent designated on the cover page to this Project document has been duly delegated by the Government coordinating authority, the Department of Economic Affairs, Ministry of Finance, to carry out this project and accordingly will follow the NEX accounting, financial reporting and auditing procedures set forth in the following document as may be amended by UNDP from time to time.
  • a) The accounting and Financial reporting procedures set out in UNDP Programme and Project Manual (PPM), Section 30503, sub-section 6.
  • b) The UNDP Audit Requirements set out in PPM Section 30503, sub-section 7.0 and
  • c) The UNDP Government Execution Manual (GEM).
  • The above documents are an integral part of this project document alongwith incorporated herein only by reference. They have already been provided to the Government and said Government Executing Agent.
    Auditors to the project will be officially designated. Such auditor, and/or other officially appointed auditors shall undertake periodical management and financial audits of the project in accordance with UNDP auditing procedures for nationally executed projects, pursuant is the Government's overall national execution responsibilities under the Project Document and as set out in the document listed above.
    In addition, all accounts maintained by the Government for UNDP resources may be audited by the UNDP internal Auditors and/or the United Nations Board of Auditors or by public accountants designated by the United Nations Board of Auditors.

    J. BUDGETS

    During the first three years, SDNP-India will be funded by the UNDP, Government of India and IDRC. The contributions of the UNDP and the Government of India are shown in the following budget charts:
    1. Total UNDP Contribution ($)
    2. Total GOI Contribution (Rs.)
    3. For Objective 1: Clearinghouse
  • a) UNDP Contribution ($)
  • b) Government of India Contribution (Rs.)
  • 4. For Objective 2: Association
  • a) UNDP Contribution ($)
  • b) Government of India Contribution (Rs.)
  • 5. For Objective 3: Management
  • a) UNDP Contribution ($)
  • b) Government of India Contribution (Rs.)
  • The first two charts show total project contributions. The remaining six charts show contributions as they relate to each objective.
    SDNP1
    SDNP2
    CHART 2: Total GOI Contributions (Rs.)
    Budget Notes
    • Line 21: SDNP Node Support Costs; Rs.100,000 per node; 8 nodes per year
    • Line 22: ERNET subscriptions; Rs.50,000 per node; 8 nodes per year
    • Line 23: Database automation; Rs.100,000 per database; 8 databases per year
    • Line 24: Database development; Rs.200,000 per database, 8 databases per year
    • Line 33: In-Service training; Rs.100,000 per programme; 5 programmes per year;
  • Of these 5 programmes per year, 1 programme for nodes
    • Line 34: Meetings/Workshops; Rs.500,000 per General Body,
    • Rs.200,000 per management, Rs.300,000 for Working Group;
    • Rs.1000,000 per year Total
    • Line 40: Equipment ' - Local Procurement
    SDNP4A
    SDNP4B
    SDNP5A
    SDNP5B
    SDNP6A
    SDNP6B
    
    
    ANNEXURE I
    WORKPLAN
    The workplan will elaborate on the three objectives and their main activities, as given in Figure 6. It will give detailed tasks, timings and responsibility. It should be the first thing developed by the SDNP-India Coordinator. This will form part of the document.

    ANNEXURE II
    REVIEW SCHEDULE
    Apart from the standard annual reviews, the content, organization, terms of reference and timings of other reviews/reports will be decided in consultation between the parties involved in the project - including the SDNP-India Coordinator, the SDNP-India Steering Committee, MOEF, NCST, SDNP-NY and UNDP.
    This will be one of the initial responsibilities of the SDNP-India Coordinator, after developing the Workplan.
    ANNEXURE-III
    Standard Annex to project documents for use in countries which are not parties to the Standard Basic Assistance Agreement (SBAA)
    
    
    General responsibilities of the Government, UNDP and the executing agency
  • 1. All phases and aspects of UNDP assistance to this project shall be governed by and carried out in accordance with the relevant and applicable resolutions and decisions of the competent United Nations organs and in accordance with UNDP's policies and procedures for such projects, and subject to the requirements of the UNDP Monitoring, Evaluation and Reporting System.
  • 2. The Government shall remain responsible for this UNDP­ assisted development project and the realization of its objectives as described in this Project Document.
  • 3. Assistance under this Project Document being provided for the benefit of the Government the people of the particular country or territory), the Government shall bear all risks of operations in respect of this project.
  • 4. The Government shall provide to the project the national counterpart personnel, training facilities, land, buildings, equipment and other required services and facilities. It shall designate the Government Co­operating Agency named in the cover page of this document (hereinafter referred to as the "Co­ operating Agency"), which shall be directly responsible for the implementation of the Government contribution to the project.
  • 5. The UNDP undertakes to complement and supplement the Government participation and will provide through the executing Agency the required expert services, training, equipment and other services within the funds available to the project.
    1. Upon commencement of the project the Executing Agency shall assume primary responsibility for project execution and shall have the status of an independent contractor for this purpose. However, that primary responsibility shall be exercised in consultation with UNDP and in agreement with the Co­operating Agency. Arrangements to this effect shall be stipulated in the Project Document as well as for the transfer of this responsibility to the Government or to an entity designated by the Government during the execution of the project.
    2. Part of the Government's participation may take the form of a cash contribution to UNDP. In such cases, the Executing Agency will provide the related services and facilities and will account annually to the UNDP and to the Government for expenditure incurred.
  • (a) Participation of the Government
  • 1. The Government shall provide to the project the services, equipment and facilities in the quantities and at the time specified in the Project Document. Budgetary provision, either in kind or in cash, for the Government's participation so specified shall be set forth in the Project Budgets.
  • 2. The estimated cost of items included in the Government contribution, as detailed in the Project Budget, shall be based on the best information available at the time of drafting the project proposal. It is understood that price fluctuations during the period of execution of the project may necessitate an adjustment of said contribution in monetary terms; the latter shall at all times be determined by the value of the services, equipment and facilities required for the proper execution of the project.
  • 3. Within the given number of man­months of personnel services described in the Project Document, minor adjustments of individual assignments of project personnel provided by the Government may be made in consultation with the Executing Agency, if this is found to be in the best interest of the project. UNDP shall be so informed in all instances where such minor adjustments involve financial implications.
  • 4. The Government shall continue to pay the local salaries and appropriate allowances of national counterpart personnel during the period at their absence from the project while on UNDP fellowships.
  • 5. The Government shall defray any customs duties and other charges related to the clearance of project equipment, its transportation, handling, storage and related expenses within the country. It shall be responsible for its installation and maintenance, insurance, and replacement, if necessary, after delivery to the project site.
  • 6. The Government shall make available to the project ­ subject to existing security provision ­ any published and unpublished reports, maps, records and other data which are considered necessary to the implementation of the project.
    1. Patent rights, copyright rights and other similar rights to any discoveries or work resulting from UNDP assistance in respect of this project shall belong to the UNDP. Unless otherwise agreed by the Parties in each case, however, the Government shall have the right to use any such discoveries or work within the country free of royalty and any charge of similar nature.
    2. The Government shall assist all project personnel in finding suitable housing accommodation at reasonable rents.
    3. The services and facilities specified in the Project Document which are to be provided to the project by the Government by means of a contribution in cash shall be set forth in the Project Budget. Payment of this amount shall be made to the UNDP in accordance with the Schedule of Payments by the Government.
    4. Payment of the above mentioned contribution to the UNDP on or before the dates specified in the Schedule of Payments by the Government is a prerequisite to the commencement or continuation of project operations.
  • b) Participation of the UNDP and the executing agency
  • 1. The UNDP shall provide to the project through the Executing Agency the services, equipment and facilities described in the Project Document. Budgetary provision for the UNDP contribution as specified shall be set forth in the Project Budget.
  • 2. The Executing Agency shall consult with the Government and UNDP on the candidature of the Project manager who, under the direction of the Executing Agency, will be responsible in the country for the Executing Agency's participation in the project. The Project Manager shall supervise the experts and other agency personnel. He shall be responsible for the management and efficient utilization of all UNDP­financed inputs, including equipment provided to the project.
  • 3. The executing Agency, in consultation with the Government and UNDP, shall assign international staff and other personnel to the project as specified in the Project Document, selected candidates for fellowships and determine standards for the training of national counterpart personnel.
  • 4. Fellowships shall be administered in accordance with the fellowships regulations of the Executing Agency.
  • 5. The Executing Agency, in consultation with the Government and UNDP, execute part or all of the project by subcontract. The selection of subcontractors shall be made, after consultation with the Government and UNDP, in accordance with the Executing Agency's procedures.
  • 6. All material, equipment and supplies which are purchased from UNDP resources will be used extensively for the execution of the project, and will remain the property of the UNDP in whose name it will be held by the Executing Agency. Equipment supplied by the UNDP shall be marked with the insignia of the UNDP and of the Executing Agency.
  • 7. Arrangements may be made, if necessary, for a temporary transfer of custody of equipment to local authorities during the life of the project, without prejudice to the final transfer.
  • 8. Prior to completion of UNDP assistance to the project, the Government, the UNDP and the Executing Agency shall consult as to the disposition of all project equipment provided by the UNDP. Title to such equipment shall normally be transferred to the Government, or to an entity nominated by the Government, when it is required for continued operation of the project or for activities following directly therefrom. The UNDP may, however, at its discretion, retain title to part or all of such equipment.
  • 9. At an agreed time after the completion of UNDP assistance to the project, the Government and the UNDP, and if necessary the Executing Agency, shall review the activities continuing from or consequent upon the project with a view to evaluating its results.
  • 10. UNDP may release information relating to any investment oriented project to potential investors, unless and until the Government has requested the UNDP in writing to restrict the release of information relating to such project.
  • Rights, Facilities, Privileges and Immunities
  • 1. In accordance with the Agreement concluded by the United nations (UNDP) and the Government concerning the provision of assistance by UNDP, the personnel of UNDP and other United nations organizations associated with the project shall be accorded rights, facilities, privileges and immunities specified in said Agreement.
  • 2. The Government shall grant UN volunteers, if such services are requested by the Government, the same rights, facilities, privileges and immunities as are granted to the personnel of UNDP.
  • 3. The Executing Agency's contractors and their personnel (except nationals of the host country employed locally) shall.
  • (a) Be immune from legal process in respect of all acts performed by them in their official capacity in the execution of the project;
  • (b) Be immune from national service obligations;
  • (c) Be immune together with their spouses and relatives dependent on them from immigration restrictions;
  • (d) Be accorded the privileges of bringing into the country reasonable amounts of foreign currency for the purposes of the project or for personal use of such personnel, and of withdrawing any such amounts brought into the country,or in accordance with the relevant foreign exchange regulations, such amounts as may be earned therein by such personnel in the execution of the project; and
  • (e) Be accorded together with their spouses and relatives dependent on them the same repatriation facilities in the event of international crisis as diplomatic envoys.
  • 4. All personnel of the Executing Agency's contractors shall enjoy inviolability for all papers and documents relating to the project.
  • 5. The Government shall either exempt from or bear the cost of any taxes, duties, fees or levies which it may impose on any firm or organization which may be retained by the Executing Agency and on the personnel of any such firm or organization, except for nationals of the host country employed locally, in respect of :
  • (a) The salaries or wages earned by such personnel in the execution of the project;
  • (b) Any equipment, materials and supplies brought into the country for the purposes of the project or which, after having been brought into the country, may be subsequently withdrawn therefrom;
  • (c) Any substantial quantities of equipment, materials and supplies obtained locally for the execution of the project, such as, for example, petrol and spare parts for the operation and maintenance of equipment mentioned under (b), above, with the provision that the types and approximates quantities to be exempted and relevant procedures to be followed shall be agreed upon with the Government and, as appropriate, recorded in the project Documents; and
  • (d) As in the case of concessions currently granted to UNDP and Executing Agency's personnel, any property brought, including one privately owned automobile per employee, by the firm or organization or its personnel for their personal use or consumption or which after having been brought into the country, may subsequently be withdrawn therefrom upon departure of such personnel.
  • 6. The Government shall ensure:
  • (a) prompt clearance of experts and other persons performing services in respect of this project; and
  • (b) the prompt release from customs of :
  • (i) Equipment, materials and supplies required in connection with this project; and
  • (ii) Property belonging to and intended for the personal use or consumption of the personnel of the UNDP, its Executing Agencies, or other persons performing services on their behalf in respect of this project, except for locally recruited personnel.
  • 7. The privileges and immunities referred to in the paragraphs above, to which firm or organization and its personnel may be entitled, may be waived by the Executing Agency where, in its opinion or in the opinion of the UNDP, the immunity would impede the course of justice and can be waived without prejudice to the successful completion of the project or to the interest of the UNDP or the Executing Agency.
  • 8. The Executing Agency shall provide the Government through the resident representative with the list of personnel to whom the privileges and immunities enumerate above shall apply.
  • 9. Nothing in this Project Document or Annex shall be constructed to limit the rights, facilities, privileges or immunities conferred in any other instrument upon any person, natural or juridical, referred to hereunder.
  • Suspension or termination of assistance
  • 1. The UNDP may be written notice to the Government and to the Executing Agency concerned suspend its assistance to any project if in the judgement of the UNDP any circumstance arises which interferes with or threatens to interfere with the successful completion of the project or the accomplishment of its purposes. The UNDP may, in the same or a subsequent written notice, indicate the conditions under which it is prepared to resume its assistance to the project. Any such suspension shall continue until such time as such conditions are accepted by the Government and as the UNDP shall given written notice to the Government and the Executing Agency that it is prepared to resume its assistance.
  • 2. If any situation referred to in paragraph 1. above, shall continue for a period of fourteen days after notice thereof and of suspension shall have been given by the UNDP to the Government and the Executing Agency, then at any time thereafter during the continuance thereof, the UNDP may be written notice to the Government and the Executing Agency terminated the project.
  • 3. The provisions of this paragraph shall be without prejudice to any other rights or remedies the UNDP may have in the circumstances, whether under general principles of law or otherwise.
  • ANNEXURE IV
    TRAINING PROGRAMME
    The Training Programme will also be developed by the SDNP-India Coordinator, as one of many systems listed in Figure 5.
    ANNEXURE V
    EQUIPMENT REQUIREMENTS
    The foreseen equipment required is listed in following attachment. The SDNP Coordinator will need to review this, change it if necessary and then present it to the National Steering Committee.
    ANNEXURE V
    EQUIPMENT REQUIREMENTS
    Consolidated Budget (Million Rupees)
    _____________________________________________________________________________________________
    Year 1          Year 2          Year 3          Total
    ____________________________________________________________________________________________
    
    
    a. SDNP Office
            1.      Frontend Costs           2.530           -               -               2.530
            2.      Recurring Costs          2.247           2.247           2.247           6.741
    
    
    
    b. Catalytic Funds
            1.      for Nodes                1.000           1.750           2.250           5.000
            2.      for Databases            3.000           3.000           3.000           9.000
            3.      Training/Promotion       3.100           3.100           3.100           9.300
    ____________________________________________________________________________________________
    Total                           11.877          10.097          10.597          32.571
    ___________________________________________________________________________________________
    
    

    Detailed Budget (Rupees)

    a. SDNP Office

    1. Frontend Costs

    ___________________________________________________________________________________________
            i)      Hardware                        Nos.            Rate(Rs.)               Value(Rs.)
                    486 Server                      2               250,000           500,000
                    Modems V.32bis          2                60,000                   120,000
                    Routers                         1               900,000           900,000
                    Sub-total                                                               1,520,000
    
    
  • ii) Software
  •                 Unix with TCP/IP                1               200,000           200,000
                    RDBMS                   1               600.000           600.000
                    Sub-total                                                                 800,000
            iii)    Cost of 9600 bps leased line    1               150,000           150,000
                    Telephone Lines                 2                30,000                    60,000
                    Sub-total                                                                 210,000
    _____________________________________________________________________________________________
    Total Frontend Costs                                                            2,530,000
    ____________________________________________________________________________________________
    
    

    2. Recurring Costs

    _____________________________________________________________________________________________
            i)      Line rental for 9600 bps line   1                                         150,000
            ii)     Hardware & Software Maintenance                                   253,000
    
    
  • iii) Miscellaneous costs
  • iv) Staff costs
    • SDNP coordinator 1 16,000x12 192,000
    • Computer professionals 2 7,500x12 180,000
    • Professionals 2 7,500x12 180,000
    • Support staff 4 4,000x12 192,000
  •                 Total staff cost                                                                  744,000
            v)      Rent for premises                                                         NIL
            vi)     Travel + Local                                                            200,000
            vii)    Office expenses                                                           200,000
            viii)   Telephone costs                                                           200,000
    _____________________________________________________________________________________________
    Total recurring cost pa                                                 2,247,000
    _____________________________________________________________________________________________
    
    
    
    

    b. Catalytic Funds

    1. Catalytic Funds for SDNP Nodes

    _____________________________________________________________________________________________________
    Year 1          Year 2          Year 3
    _____________________________________________________________________________________________________
    
            i)      Node costs                      1,000,000       1,750,000       2,250,000
            ii)     Subscription
                    @Rs.50,000/site                   500,000        1,000,000       1,500,000
            iii)    Sub Total                       1,500,000       2,750,000       3,750,000
    
    
    

    2. Catalytic Funds for Database Development

            i)      Automating                      1,000,000       1,000,000       1,000,000
            ii)     Developing                      2,000,000       2,000,000       2,000,000
            iii)    Sub Total                       3,000,000       3,000,000       3,000,000
    
    
    

    3. Catalytic Funds for Training/Promotion

            i)      Meetings                        1,000,000       1,000,000       1,000,000
            ii)     Fellowships                     1,100,000       1,100,000       1,100,000
            iii)    Promotional                       500,000          500,000          500,000
            iv)     Training                          500,000          500,000          500,000
                    Sub Total                       3,100,000       3,100,000       3,100,000
    ____________________________________________________________________________________________________
            
    Total Catalytic Funds                   7,600,000       8,850,000       9,850,000
    Notes:
    
    
    • Funding would be subject to the node being used by a minimum number of users per site and achieving a minimum amount of traffic/transactions.
    • Database relevance would be decided by the SDNP Office in consultation with the association.
    • 10 new nodes would be funded per year for the first three years. Nodes will be selected by the NSC. 30 nodes would be funded by SDNP. These nodes would be funded for three years with the funding reducing by 25% of the initial amount in each subsequent year.
    ANNEXURE VI
    JOB DESCRIPTIONS
    The type and number of staff required is listed in section 4.4.2 of the SDNP-India Feasibility Report. The SDNP Coordinator will need to review this, change it if necessary and then present it to the National Steering Committee. Specific job descriptions of each staff person will need to be developed at a later date.
    ANNEXURE VII
    PARTICIPATION FRAMEWORK
    Figure 4 shows the proposed Organization Structure for SDNP-India.
    UNDP/IDRC personnel are foreseen to participate in the SDNP National Steering Committee and possibly in the Management Group and as an SDNP Node site.
    MOEF personnel are foreseen to participate in the SDNP National Steering Committee, the SDNP Office, the SDNP Node and possible the Management Group.


    ANNEX VIII
    FINANCIAL AND ACCOUNTING ARRANGEMENTS
    A. General
  • 1. The Government of India, hereinafter referred to as "the Government", is responsible to the Administrator of UNDP for the custody and proper use of funds advanced to it by UNDP.
  • 2. The Government will maintain separate accounts [including a separate bank account] for UNDP resources. It will use the funds provided to it only for inputs financed by UNDP, in accordance with the project budget covering UNDP's contribution. (Ref PPM Part III, section 30305, subsection 3.0.)
  • 3. Advances of funds to and payments by UNDP on behalf of Governments are governed by the applicable UNDP Financial Regulations and Rules and directives regarding the utilization of currencies.
  • 4. The Government will provide UNDP with financial statements of UNDP funds received and spent, prepared in accordance with the UNDP financial year (1 January to 31 December) in English. The periodicity and content of such statements are set out below. Annual financial statements will be audited by the legally recognized auditors of the Government's own accounts. To the extent feasible, the audit principles and procedures prescribed for the United Nations will be applied by the auditors, who will provide audit reports annually together with the reports set out below.
  • 5. For the purpose of reporting to UNDP, US dollar equivalents will be calculated at the United Nations operational rates of exchange. The resident representative of UNDP will inform the Government of such United Nations rates of exchange and of changes thereto when they occur.
  • B. Advance of funds
  • 6. Advances will be made by the resident representative at the request of the Government in accordance with the project document and in the required currencies subject to the conditions set out below.
  • 7. The Government will indicate its cash requirements from UNDP funds for each period of the schedule of advances included in the project document at least two weeks before payment is due (attachment 1 of this annex, Request for advance of funds). Advances will be made by UNDP at the time indicated in the schedule of advances, in the amounts and currencies requested by the Government. (See also paragraph 9, below for requests for cash advances in currencies not available to the UNDP field office.)
  • 8. If the schedule of advances included in the project document no longer reflects actual requirements for funds, a new schedule will be prepared by the Government in consultation with the resident representative, in accordance with the format indicated in attachment 5 of this annex, Schedule of advances. Advances should normally be sufficient to cover anticipated cash requirements for a maximum of three months.
  • 9. Local currency advances to the Government will normally be made by the resident representative.
  • 10. Advances to the Government in US dollars will be made by the resident representative if this currency is available to him or her. The resident representative will arrange for advances in currencies not available to him or her to be made by UNDP headquarters or other field offices, as deemed appropriate.
  • C. Direct payments by UNDP
  • 11. At the request of the Government, UNDP will, after verification of the supporting documentation, make payments directly to individuals or firms providing UNDP­financed services or goods. The requests will be addressed to the resident representative who will either arrange for the payments to be made by his or her office or by UNDP headquarters. The requests will indicate payee, amounts and currencies required, justification for the request and payment instructions reflecting payee's bank, its address and the account number.
  • 12. The resident representative will provide the Government with statements of direct payments made by UNDP within 15 days following 30 April, 31 August and 31 December, for incorporation in the project delivery report in accordance with paragraph 13 (b), below.
  • D. Periodic financial statement
  • 13. The Government will furnish the resident representative with certified financial statements within 30 days following 30 April and 31 August and within 60 days following 31 December. The statements will include the following:
  • (a) Status of funds advanced by UNDP (attachment 2 of this annex). The statement will be submitted for each period indicated above and will be prepared in the currency of the advance. Separate statements will be issued where different currencies have been advanced. Each statement will reflect cumulatively for the year the amount of funds available at the beginning of the year, funds advanced by UNDP, funds expended by the Government during the reporting period and the resulting balance at the end of that period. The statement will also detail expenditure incurred by month in local currency and the US dollar equivalent calculated at the applicable United Nations operational rate of exchange;
  • (b) Project delivery report (attachment 3 of this annex). The report will be submitted for each period indicated above and will reflect cumulative current­year expenditure classified according to the items listed in the approved project budget. It will incorporate the expenditure incurred by the Government and, where appropriate, the expenditure statement of the co­operating agency, if any, and the statement of direct payments made by UNDP;
  • (c) Annual report of UNDP­financed non­expendable equipment (attachment 4 of this annex). The Government will furnish the resident representative, for the year to 31 December, within 60 days following that date and together with other financial statements due at that date, with an annual report of non­expendable equipment. The report will include all UNDP­financed non­ expendable equipment furnished to the project during the year. Non­expendable equipment purchased by the co­operating agency, if any, and furnished to the project will also be included. The report will describe each item in detail, list the identification number given by the Government and the serial or registration number assigned by the maker and reflect and cost at the US dollar equivalent at the time of purchase calculated at the United Nations operational rate of exchange;
  • (d) Expenditure statement for jointly financed projects.
  • In the case of joint financing of project activities by the Government and UNDP and, as the case may be, other sources of assistance, the certified financial statements referred to above shall be accompanied by a separate statement reflecting expenditure for the full project covering the same period as the certified financial statements. To this expenditure statement should be added an indication of the apportionment by the Government of the reported expenditure to UNDP's contribution and other available funds.
  • 14. If the Government cannot submit the financial statements on the date on which they are due, it will inform the resident representative of the reasons and indicate the planned submission date.
  • E. Government's annual audited financial statements
  • 15. A certified and audited annual financial statement of the status of funds advanced by UNDP, as described in paragraph 13 (a), above, will be made available by the Government to the resident representative within 120 days after the end of the calendar year.
  • 16. The financial statement will be audited and attested to by the entity specified in paragraph 4, above.
  • F. Government final financial statements
  • 17. Upon financial completion of UNDP assistance to a project, the Government will provide final financial statements to cover the period 1 January to the date of either financial completion or refund of the unspent balance of UNDP funds, if any (see paragraph 18, below). The financial statements will be audited so as to conform to the requirements set out in section E above. The format given in attachments 2 and 3 of this annex should be used. The statements will be provided within 120 days from the date of financial completion to the Director, DOF, with copies to the UNDP resident representative.
  • 18. If there is an unspent cash balance of UNDP funds held by the Government, that balance will be refunded by the Government in the currency of the advance not later than 30 days after the date of financial completion.
  • G. Audit by UNDP
  • 19. All accounts maintained by the Government for UNDP resources may be audited by the UNDP internal auditors and/or the United Nations Board of Auditors or by public accountants designated by the United Nations Board of Auditors.
  • ATTACHMENTS

    Attachment 1

    GOVERNMENT OF____________
    REQUEST FOR ADVANCE OF FUNDS FROM UNDP
    FOR PROJECT______________________________NO: /
    For the period from___________19___to__________19____
    Currency
    
    
    Cash in hand at beginning of period
    
    
    Estimated disbursements to end of period
    
    
     Net advance required
    
      Payment details
    __________________________________
    Bank            
    Name and      Account      Number      address       title
    
    
    Certified by:
                                                    ______________________
    
    
  • (Name (typed)
  • Title
  • Government agency (department)
  • Attachment 2
    Page 1 of 2
    GOVERNMENT OF__________________
    STATUS OF FUNDS ADVANCED BY UNDP a_/
    FOR PROJECT___________________________________________NO.__/_____/________
    
    
    For the period 1 January to__________19________
    (currency)
    A. Summary of funds received and expended Amount
    (In currency of advance)
    Balance at 1 January 19____ xxx xxx
    Add: Advances received from UNDP xxx xxx

    Total funds available for project purposes xxx xxx
    Deduct: Total expenditure for year-to-date xxx xxx b_/
    Balance at .............19___ -------


    Represented by:
    Cash in bank xxx xxx
    Cash on hand xxx xxx

    Balance at.....................19___ xxx xxx





    ________
    a_/ A separate statement is required for each currency advanced by UNDP.
    b_/ This amount should be the same as the total expenditure (in currency of advance) in table B.


    Page 2 of 2
    B. Summary of expenditure by month

    Expenditure UN operational Expenditure
    (In currency rate of exchange (In US$ equivalent)
    of advance
  • January
  • February
  • March
  • April
  • May
  • June
  • July
  • August
  • September
  • October
  • November
  • December
  • Total a_/



    Certified correct by: Approved by:

    ____________________________________ __________________________
    Name (typed) Name (typed)
    Chief Accountant Title
    Government agency (department) Government agency (department)


    ______________________________________
    AUDIT CERTIFICATE
    (As issued and signed by the Auditors)
    REQUIRED ONLY FOR ANNUAL AUDITED
    AND FINAL AUDITED FINANCIAL STATEMENTS
    _____
    a_/ This amount should be the same as the total expenditure for year-to-date in Table A.
    Attachment 3
    GOVERNMENT OF____________
    PROJnECT TITLE________________________________UNDP Project No. (___________ )
    Project delivery report
    for funds provided by United Nations Development Programme (UNDP)
    for the period 1 January to______________19_
    (Prepared in US dollars)
    Budget Line
    
    
    Description
    
    
    Budget per year
    
    Government
    
    
      Expenditure
    ________________________________________
    UNDP direct      Co-ooperating 
    payments         agency 
          Total
    
    
     (1)
    
    
         (2)
    
    
       (3)
    
       (4)           
    
    
        (5)
    
        (6)
    
    
       (7)
    
    99.00
    
    
    Total
    
    
      a_/
    
    
    Certified correct by:                                   Approved by:
    
    ____________________________________                    __________________________
    Name (typed)                                            Name (typed)
    Chief Accountant                                                Title
    Government agency (department)                          Government agency (department)
    
    
            ______________________________________
    
    
    AUDIT CERTIFICATE
    (As issued and signed by the Auditors)
    
    
    REQUIRED ONLY FOR ANNUAL AUDITED
    AND FINAL AUDITED FINANCIAL STATEMENTS
    a_/ Total of US dollars equivalent shown in each attachment 2.
    
    
    Attachment 4
    GOVERNMENT OF________________
    Annual report of UNDP- financed non-expendable equipment a_/
    for project No.________________________
    
    
    For the year ended 31 December 19___
         Description
    _________________
    
    
    
    Government identification number
    
    
    
    Maker's serial or registration number 
       
    
    
    Cost in US dollars b_/ 
        
    
    
    Total 
    
    
    Certified by
                                                    ____________________
    
    
  • Name (typed)
  • Title
  • Government agency (department)
  • a_/ Includes those items of equipment valued at $400 or more, and with a serviceable life of at least five years, and those items of equipment although valued at less than $400, which are office furniture, filing cabinets, office machines, attractive items (such as cameras, projectors, stop watches, briefcases) or other similar items as determined by the Government.
    b_/ US dollar equivalent at time of purchase calculated at the United Nations operational rate of exchange.
    Attachment 5
    (PROJECT NUMBER AND TITLE)
    SCHEDULE OF ADVANCES a_/
    
    
    US$
    A.      Funds advanced to date                                  xxx xxx
    
    B.      Funds to be advanced in forthcoming 12 months b_/
    
    
  • i) To Government

  • Date Amount
    ___________ _______


    __________ _______

    Total xxx xxx

    ii) To co-operating agency xx xxx

    C. Funds to be advanced in subsequent periods xxx xxx

    TOTAL ALLOCATION PER PROJECT BUDGET (LINE 99) _________
    xxx xxxx
    ---------

    _________

    a_/ To be included in the project document immediately following the budget for UNDP's contribution (part IV). Advances should only cover anticipated cash requirements for a maximum of three months.
    b_/ The period to be covered should be the 12 months following the date of approval of the project revision.



    | Project Summary Status | Africa | Arab States | Asia | Europe/CIS | LA/Caribbean |